You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Kelapa Gading Timur Diperbaiki

Damaged Retaining Wall in Kelapa Gading Timur Being Repaired

The Kelapa Gading Sub-district Water Resources Executing Unit (SDA), North Jakarta, repairs the channel's retaining wall on Jalan Kelapa Cengkir Barat IV, RT 05/11, Kelapa Gading Timur Urban Village.

Hopefully everything runs smoothly

Kelapa Gading Sub-district SDA Executing Unit Head, Jhoni Sariyanto Situmorang said, this repair is a follow-up to the residents' aspirations, who reported that the retaining wall is already heavily damaged and collapsed, which naturally obstructs water flow and triggers flooding.

"After receiving the complaint, we immediately conducted a survey. Many parts were damaged, so we promptly took action," he expressed, Wednesday (10/1).

Sidewalk and Taman Barito Bus Stop Fully Repaired

He explained, the repaired channel has 72 meters long, 40 centimeters wide, and one meter high. This was done manually with nine personnel.

"It starts with breaking through the wall. Next, the retaining wall is repaired using river stones, and the exterior is plastered with cement to make it smooth and neat," he explained.

It has been underway since September 29, 2025, and is targeted for completion within 20 days.

"Hopefully everything runs smoothly according to schedule because it is currently the rainy season," he hoped.

He encourages residents to help keep the water channels clean by not littering.

"Hopefully, after repairs, the water flow will be smoother; the most important thing is to keep the channel clean," he asserted.

This repair received appreciation from a resident from RW 011, Kelapa Gading Timur Urban Village, Hidayat (55).

"Hope it can be finished as soon as possible," he hoped.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1395 personFakhrizal Fakhri
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye990 personAldi Geri Lumban Tobing
  3. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye865 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye755 personAldi Geri Lumban Tobing
  5. Jalan RS Fatmawati Widening Supports Transit-Oriented Development

    access_time19-02-2026 remove_red_eye709 personTiyo Surya Sakti